A correct design is the foundation of a safe, efficient facility. SOREAS produces approved, calculation-based and authority-defensible electrical designs for your high-, medium- and low-voltage installations.

Calculation-based, buildable designs

We produce single-line diagrams backed by load-flow, voltage-drop and short-circuit calculations. Short-circuit currents follow IEC 60909-0:2016, cable cross-sections follow TS HD 60364-5-52 with a ≤5% voltage-drop criterion, and protection coordination is set on a selectivity basis.

Lighting, earthing and approvals

We design lighting to the TS EN 12464-1:2021 illuminance requirements, and earthing and lightning protection to the relevant standards. We complete OIZ and utility approval processes quickly with complete files and correct calculations.

//01Frequently Asked Questions

It depends on scope and the authority's workload. With complete files and correct calculations, SOREAS completes approval as quickly as possible.

All of HV, MV and LV — end to end, from the substation to panel outputs.

Yes. We calculate short-circuit currents per IEC 60909-0:2016 and set breaker/fuse selection and selectivity into the design. These calculations are usually required for OIZ provisional-acceptance files.

Yes — for capacity increases, machine additions or compliance fixes, including as-built updates.